US$ 11835.00
Item Length - 1
With a contemporary design perfect for the early 2000s to the present
The result was a group of 65 4-6-6-4 Challenger built in three separate groups during World War II
the 255mm long lighting strip can be retrofitted with an optional 'Power Pack'
Not previously available in OO scale
4P-020-401 GWR Toplight Mainline City GWR All Brown Third Brake 3755 Set 5 flash-sale Item Length - 1The first order for these coaches was placed in 1915 but, due to the First World War, they were not built until 1920. The second batch was completed in 1921. Six sets of coaches were produced with each set comprising six coaches. The coaches were close coupled and constructed with a steel body rather than the traditional wooden panelling. Due to the restrictive loading gauge of the London Underground tunnels, the carriages are 7 inches lower than
US$ 11835.00
US$ 11880.00
US$ 32.50
US$ 106.25
US$ 7110.00
US$ 6255.00
US$ 11070.00